English stories

Inspection work at the Honoré-Mercier Bridge

le samedi 05 octobre 2019
Modifié à 7 h 50 min le 05 octobre 2019
 The Ministry of Transport will carry out inspection work at the Honoré-Mercier Bridge. This intervention requires the closure of 1 of 2 lanes on the Honoré-Mercier Bridge towards the South Shore, from Saturday, October 5 to Thursday, October 10, between 9 p.m. and 5 a.m. In the event of adverse weather conditions or operational constraints, some closures may be postponed.